国产日韩欧美性爱,国产精品一二三色欲,啪啪啪国产一区二区三区,日熟女伦理一区二

Drilling Method of Underground Clearance of Full Circle Casi

Full rotary drilling rig without leaving the pile construction technology is: the whole rotary equipment is able to drive the steel casing for 360 ° rotation, and steel casing press and removal of the construction machinery. The equipment in the operation to produce the next pressure and torque, driving steel casing rotation, the use of high-strength nozzle tip of the soil, rock and reinforced concrete and other obstacles to cut, the use of casing wall effect, and then use hydraulic punch Bucket will be caught inside the steel casing, in the casing within the clearance pile piling operations. After the completion of the barrier, the steel casing backfill cement construction. Backfill can be used to build a better plastic shield construction, and mixed with 7% -10% cement. In the backfill process, pay attention to keep the steel sleeve is lower than the backfill cement top elevation ≥ 2m; when the steel casing is fully removed, the cement soil is also filled to the ground. As the backfill is looser, in order to avoid the adverse effects of late settlement on the surrounding environment, the backfill is filled with grouting immediately after completion of the backfill to ensure the strength of the backfill. The complete set of equipment includes full rotary drive, steel casing, hydraulic punching, in order to achieve the cutting of large volume of concrete after the broken, in some cases also equipped with special drill, in addition, also equipped with a crawler crane, hydraulic punch The use of the grab at the same time provides a balanced reaction force for the sleeve torque. Full rotary power equipment is mainly for the casing 360 ° rotation and cutting head to provide obstacles, including the upper and lower hoop clamping system and a vertical jacking system. The hoop clamping system is the main locking system, which is clamped by the hydraulic drive to provide the drive torque and downward force into the casing. The diameter of the standard casing is 1000 to 3000 mm. If the diameter of the casing is small, it can be applied to the inside of the hoop system. Under the hoop clamping system for the auxiliary locking system, in the process of pulling the top of the casing, the next clamping device alternately on the casing to prevent the casing to fall. The vertical jacking system is mainly used for top-up of the casing. Driving system can provide the maximum pressure into the fuselage of the weight, when the press force is not enough to increase the weight of the case. In the process of casing rotation, in order to prevent the body's own weight, when the press force is not enough to increase the weight of the case. In the casing rotation process, in order to prevent the fuselage along with the casing with a dedicated anti-torque lock to lock the fuselage. The driving device can adjust the steering torque, slewing speed, pressing force and clamping force of the casing arbitrarily within the working ability of the equipment. Rotation speed set high, medium and low third gear speed, according to casing diameter, geological conditions and changes in torque and so choose the most appropriate speed of rotation. Horizontal adjustment cylinder with a dedicated hydraulic circuit, so the casing can also adjust the vertical rotation.
亚洲精品乙2019| 亚洲春色无码aV专区在线| 老司机美女人体一区二区| 毛片一区二区三无码视频| 日韩一二线精品视频在线观看| 国产免费一区二国产| 欧美日韩少妇人妻一区二区| 女生扒开腿爽桶男生免费网站| 精品久久久中文字幕不卡| 女优天堂久久| 国产精品欧美日视頻| 天天操天天日天天身| 日韩人妻AV小电影一区二区| 亚洲AV精一区二区三区四区| 和18岁美女操B大爽| 99久久免费在线视频| 日本午夜服利| 欧美久久精品无毛| 色婷婷视频分类| 国产精品91视频播放| .欧美黄片网站| 国产尺寸最大操逼| 嗯嗯嗯自拍视频| 日韩特别级久久久| 免费观看一区青青草| 国产精品久久99黄色| 午夜福利日本片| AV亚洲二区在线| 人人交小穴| 精品一区二区久久久久久无码小说| 91成人激情视频| 欧美中文磁力色资源| 免费av不卡一区二区| 天天爽天天日天天射| av视屏| 91麻豆精品国产版的广告功能| 久一区美私拍视频| 你懂的日韩欧美视频网址| 二区三区精| 日韩aⅴ| 一区在线网站|